4-Design, construction and installation the horizontal equipment of 20000 tons of Kuhdasht Lorestan silo under operation)
5-Design, construction and installation of 20,000-ton horizontal silo equipment Hashtrood Tabriz (under operation)
6- Supply of 20,000 ton Silo equipment in Saveh (ready to be delivered)
7- Designing, manufacturing and installing equipments for increasing the capacity of 80000 tonne silage loaded and discharged Karaj (temporary delivery).
2016
8- Design and construction of horizontal equipment 40000 ton silos of Borazjan (temporary delivery)
9- Design, construction and installation of 40,000-ton horizontal sewage silos (run and ready to install)
Recent Comments